Dell PowerScale Maintenance (D-PSC-MN-01)
Get full access to the updated question bank and confidently prepare for your exam.
Vendor
Dell
Certification
Storage
Content
148 Qs
Status
Verified
Updated
1 day ago
Test the Practice Engine
Experience our interactive testing environment with free demo questions
Premium Bundle
Complete Success Suite
Save $34 Instantly
-
โFull PDF + Interactive Engine Everything you need to pass
-
โAll Advanced Question Types Drag & Drop, Hotspots, Case Studies
-
โPriority 24/7 Expert Support Direct line to certification leads
-
โ90 Days Free Priority Updates Stay current as exams change
Success Metric
98.4% Pass Rate
Standard Simulation
Practice Engine
One-Time Payment
-
Web-Based (Zero Install)
-
Real Testing Environment Virtual & Practice Modes
-
Interactive Engine Drag & Drop, Hotspots
-
60 Days Free Updates
Compatible with All Devices
Basic Tier
PDF Study Guide
Digital Access
- โ Exam Questions (PDF)
- โ Mobile Friendly
- โ 60 Days Updates
Verified 30-Question Preview (D-PSC-MN-01)
Verified Community
The CertoMetrics Standard.
Recommend the #1 platform for verified Dell certification resources.
Success Network
Help a Colleague Succeed.
Invite a peer to get their own updated D-PSC-MN-01 prep kit.
Exam Overview
The Dell PowerScale Maintenance (D-PSC-MN-01) certification validates an individual's proficiency in maintaining and troubleshooting Dell PowerScale storage solutions. Achieving this certification demonstrates a critical understanding of PowerScale architecture, operational procedures, and best practices for ensuring system health, availability, and performance. This expertise is invaluable for minimizing downtime, optimizing resource utilization, and protecting vital data assets. Certified professionals are equipped to diagnose and resolve complex issues efficiently, perform essential upgrades, and manage system configurations, thereby contributing significantly to an organization's operational resilience and data integrity strategy. This credential elevates your professional standing, opening doors to advanced roles in enterprise storage management and solidifying your expertise in mission-critical storage infrastructure.
Questions
60
Passing Score
650/1000
Duration
90 Minutes
Difficulty
Intermediate
Level
Specialist
Skills Measured
Career Path
Target Roles
Common Questions
Is the material up to date?
Yes. We update our question bank weekly to match the latest Dell standards. You get free updates for 90 days.
What format do I get?
You get instant access to both the **PDF** (for reading) and our **Premium Test Engine** (for exam simulation).
Is there a guarantee?
Absolutely. If you fail the D-PSC-MN-01 exam using our materials, we offer a full money-back guarantee.
When do I get the download?
Instantly. The download link is available in your dashboard immediately after payment is confirmed.
Free Study Guide Samples
Previewing updated D-PSC-MN-01 bank (30 Questions).
Refer to the exhibit.

An engineer replaces the drive in C1. They run the isi devices drive list command and obtain the output that is shown.
What action must the engineer take?
Correct Option: D
โ
Option D (Correct) Reasoning: The WRONG_TYPE state indicates that the installed drive is physically incompatible with the PowerScale node or bay. This cannot be resolved by software commands like add or format, nor by a firmware update. Contacting Dell support is necessary to identify the correct replacement drive part number and obtain the appropriate hardware.
โ Why the other choices are incorrect:
Option A is incorrect: isi devices drive add is used for integrating a newly detected, unformatted drive, not for rectifying a physical type mismatch.
Option B is incorrect: The isi devices drive format command prepares a drive for use, but it cannot change an incompatible drive's physical characteristics to make it compatible.
Option C is incorrect: Updating firmware addresses software-level compatibility or bug fixes for existing, compatible hardware; it will not resolve an incorrect physical drive type.
Reference: https://www.dell.com/support/manuals/en-us/isilon-onefs/cli-8.2.1-crg/isi-devices-drive-commands?guid=guid-3375c3d4-b816-43d9-952d-80517743d7c3&lang=en-us
Refer to the exhibit.

A platform engineer has connected power cables to a Dell PowerScale Gen6 node.
What does the status indicator indicate?
Correct Option: B
โ Option B (Correct) Reasoning: The image displays green AC and DC LEDs, indicating the power supply unit (PSU) is receiving AC input and providing DC output. However, the amber '!' (fault) LED is illuminated. This combination signifies that while power is present, the PSU is in a degraded or faulted state. A common cause for such a fault without complete power failure is a mismatch in voltage, power rating, or component firmware between the PSU and the node or other PSUs in the system.โ Why the other choices are incorrect:
Option A is incorrect: There is no indicator for 'charging' on a PowerScale node PSU, and the amber '!' indicates a fault, not a charging state.
Option C is incorrect: The green DC LED indicates the PSU is active and supplying power, not merely in standby. The amber '!' signifies a fault, not a redundant or standby status.
Option D is incorrect: While the green AC and DC LEDs confirm the unit is 'On', the illuminated amber '!' (fault) LED explicitly indicates that the PSU is not 'healthy'.
Reference: https://www.dell.com/support/manuals/en-us/isilon-f200/powerscale-f200-install-service/f200-front-panel-leds?guid=guid-3d3f9ec6-8c08-41ec-b0cf-530932ce761f
What is a prerequisite for installing the TPM after replacing the system board in a PowerScale F900?
Correct Option: C
โ Option C (Correct) Reasoning: When a system board is replaced, the Trusted Platform Module (TPM) is cryptographically bound to the unique hardware configuration of the original board. For security and proper functionality, a new system board requires a new TPM or a fresh initialization to establish a new chain of trust.โ Why the other choices are incorrect:
Option A is incorrect: While physical compatibility is a factor, the fundamental issue is the TPM's security binding to the original system board, not just generic compatibility with the new board. Reusing an old TPM breaks the trust chain.
Option B is incorrect: Keeping the old TPM on a new system board is not supported practice. The security measurements and keys within the old TPM are tied to the previous board, leading to security errors or boot failures.
Reference: https://www.dell.com/support/kbdoc/en-us/000138096/poweredge-server-tpm-installation-and-troubleshooting
An engineer plans to install nodes to a cabinet with space for new hardware. All six PDU ports are occupied
What is the recommended way to support the new nodes in this cabinet?
Correct Option: C
โ Option C (Correct) Reasoning: Dell PowerScale nodes require redundant power, meaning each node's two power supplies must connect to separate Power Distribution Units (PDUs). If all existing PDU ports are occupied, installing two more PDUs ensures that new nodes can be connected with A/B power redundancy, aligning with best practices.โ Why the other choices are incorrect:
Option A is incorrect: Installing four more PDUs is excessive for simply supporting new nodes and may not be necessary for immediate needs or available cabinet space.
Option B is incorrect: Installing only one more PDU would not provide redundant power connections for new nodes, as each node requires two independent power feeds.
Option D is incorrect: Locating PDU ports in another cabinet is not the recommended approach when the goal is to install and support new nodes within the current cabinet, and it complicates cabling.
Reference: https://www.dell.com/support/manuals/en-us/isilon-f900/f600_f900_install_guide/power-specifications-and-requirements?guid=guid-15c23d06-c87a-42fc-8e4d-4d7a86fcfd58&lang=en-us
Which node is based on a Dell PowerEdge server?
Correct Option: A,B,D
โ Option A (Correct) Reasoning: The Dell PowerScale F900 nodes are part of the Gen 6 and later series, which are built upon Dell PowerEdge server platforms, offering high performance all-flash storage.โ Option B (Correct) Reasoning: The Dell PowerScale H700 nodes are hybrid storage nodes from the Gen 6 and later series. These nodes are designed to leverage Dell PowerEdge server architecture for balanced performance and capacity.โ Option D (Correct) Reasoning: The Dell PowerScale A300 nodes are archive storage nodes, also from the Gen 6 and later series. They are built upon Dell PowerEdge servers to provide cost-effective, high-capacity solutions.โ Why the other choices are incorrect:
Option C is incorrect: The F800 node is an older generation (Gen 5) Isilon all-flash node. It utilized a custom Isilon chassis and was not specifically marketed or architected as being 'based on a Dell PowerEdge server' in the same integrated manner as the Gen 6 and subsequent PowerScale nodes.
Reference: https://www.dell.com/en-us/dt/storage/powerscale/index.htm
Dell Technical Support has required a part be sent back to Dell Logistics to be studied.
Which process or document must be completed before sending the part back?
Correct Option: C
โ Option C (Correct) Reasoning: The Defective Material Return (DMR) process is required before sending failed or defective parts back to Dell Logistics for study or replacement. Dell Technical Support initiates a DMR, providing specific authorization and instructions for the return shipment. โ Why the other choices are incorrect:
Option A is incorrect: CDMR (Customer Defective Material Return) is a specific categorization within the broader DMR process, making DMR the more fundamental and general answer for the required process.
Option B is incorrect: WWFA (World Wide Failure Analysis) refers to an internal Dell activity for analyzing returned parts, not the prerequisite document or process for shipping them.
Option D is incorrect: DTFA (Dell Technical Failure Analysis) is an internal Dell process for analyzing failures, not a document or process that must be completed prior to sending a part back.
Reference: https://www.dell.com/support/home/en-us
A platform engineer is adding a node to a Dell PowerScale cluster. The node is powered on and cabled.
What option is displayed once the serial connection to the node is established?
Correct Option: D
โ Option D (Correct) Reasoning: When a new PowerScale node is powered on and connected via serial, the initial prompt focuses on configuring network parameters like IP address, subnet mask, and gateway. This fundamental step is essential for the node to communicate and become discoverable, enabling it to join an existing cluster.
โ Why the other choices are incorrect:
Option A is incorrect:
Option B is incorrect: Firmware upgrades are usually performed after the node is part of a cluster and managed, not during initial network setup via serial.
Option C is incorrect: While creating a new cluster is an option, it requires prior network configuration for inter-node communication, making network configuration the more immediate and foundational serial console step.
Reference: https://www.dell.com/support/kbdoc/en-us/000021371/dell-emc-powerscale-onefs-9-5-cli-administration-guide
What is the isi devices node smartfail command used for?
Correct Option: B
โ Option B (Correct) Reasoning: The isi devices node smartfail command is used to initiate a controlled removal of a node from a Dell PowerScale cluster. It triggers data re-protection, moving all data from the specified node to other healthy nodes before the node is physically removed or taken offline.โ Why the other choices are incorrect:
Option A is incorrect: Failover typically refers to a system automatically switching to a redundant component during a failure, which is not the primary function of smartfail.
Option C is incorrect: Adding a node involves different commands and procedures to integrate a new node into the cluster, not smartfail.
Option D is incorrect: Failback implies returning a system to its primary operational state after a failover, which is the opposite of smartfail's purpose.
Reference: https://www.dell.com/support/manuals/en-us/isilon-onefs/onefs-cli-admin-guide-9.5/managing-nodes?guid=guid-3d3f9453-6a2c-4f7f-be9d-f213b3c3c13b&lang=en-us
What is recommended when replacing the M.2 card in a PowerScale Gen6 system?
Correct Option: C
โ Option C (Correct) Reasoning: When replacing internal components like an M.2 card in a PowerScale Gen6 system, removing the battery pack and disconnecting its cable is a critical safety measure. This ensures the system is completely depowered, preventing electrical hazards or accidental damage during maintenance.โ Why the other choices are incorrect:
Option A is incorrect: Ignoring active power sources like battery packs is unsafe and risks electrical shorts or component damage during internal hardware procedures.
Option B is incorrect: Keeping the battery caddy connected means the battery remains a live power source, which violates fundamental safety protocols for working inside server hardware.
Option D is incorrect: The HBA riser often obstructs access to other internal components, including M.2 slots, and typically requires removal to facilitate proper and safe replacement procedures in a PowerScale Gen6 node.
Reference: https://www.dell.com/support/manuals/en-us/powerscale-f800/powerscale_f800_servicemanual
Which port is used for the WebUI on a Dell PowerScale cluster?
Correct Option: D
โ Option D (Correct) Reasoning: The Dell PowerScale OneFS WebUI defaults to port 8443 for secure HTTPS access. This port is specifically used for the web administration interface to ensure encrypted communication.โ Why the other choices are incorrect:
Option A is incorrect: Port 9443 is not the standard or default port for the Dell PowerScale OneFS WebUI.
Option B is incorrect: Port 22 is reserved for SSH (Secure Shell) command-line access, not for the graphical WebUI.
Option C is incorrect: While port 8080 can be used for the WebUI over HTTP, 8443 is the default for secure HTTPS access, which is the standard and recommended method for management.
Reference: https://infohub.delltechnologies.com/t/powerscale-onefs/
What is the purpose of SolVe Desktop?
Premium Solution Locked
Unlock all 148 answers & explanations
What is recommended when connecting the power cables to a new 4U chassis?
Premium Solution Locked
Unlock all 148 answers & explanations
What must be verified during the installation of a fully populated Titan-HD rack with H7000 nodes?
Premium Solution Locked
Unlock all 148 answers & explanations
A customer wants to create a cluster mixing F600 and A300 nodes.
What is the minimum number of each node type that they need to build the cluster?
Premium Solution Locked
Unlock all 148 answers & explanations
What is the main purpose of the vault operation in PowerScale F200, F600 and F900?
Premium Solution Locked
Unlock all 148 answers & explanations
An engineer runs the isi status command.
What are they trying to accomplish?
Premium Solution Locked
Unlock all 148 answers & explanations
A customer wants to add SSDs to the drive sleds in a Dell PowerScale H600 node for expanded caching.
What should the platform engineer tell the customer?
Premium Solution Locked
Unlock all 148 answers & explanations
A platform engineer is replacing a failed Dell PowerScale Gen6 node at a customer site. They remove all cables from the compute module and observe that some of the LEDs inside the node are lit.
What action must the platform engineer take?
Premium Solution Locked
Unlock all 148 answers & explanations
Following Dell best practices, which external network ports should be used on PowerScale A300 or A3000 nodes?
Premium Solution Locked
Unlock all 148 answers & explanations
A Dell PowerScale H400 node has one SSD installed. The SSD has failed and must be replaced.
Where must the new drive be installed?
Premium Solution Locked
Unlock all 148 answers & explanations
What is the minimum amount of clearance space needed when unpacking the components pallet?
Premium Solution Locked
Unlock all 148 answers & explanations
What is the minimum OneFS version required to support PowerScale P100 and B100 Accelerator nodes?
Premium Solution Locked
Unlock all 148 answers & explanations
What is the maximum number of nodes an engineer can scale in a PowerScale Gen6 cluster?
Premium Solution Locked
Unlock all 148 answers & explanations
Which administrative task can be performed using the front panel of a Dell PowerScale F800 node?
Premium Solution Locked
Unlock all 148 answers & explanations
What two pieces of information of a node network interface can the ifconfig command be used to obtain?
Premium Solution Locked
Unlock all 148 answers & explanations
A customer is upgrading their PowerScale system. They want to have a smaller maintenance window and not introduce service outages.
Which upgrade method is recommended?
Premium Solution Locked
Unlock all 148 answers & explanations
What port configuration does backend switch model S5232-ON support?
Premium Solution Locked
Unlock all 148 answers & explanations
Which upgrade method is fastest to complete when a cluster service outage is allowed?
Premium Solution Locked
Unlock all 148 answers & explanations
How much rack space should be left open under an A3000 node when using a cable management tray in a customer-supplied Titan-HD equivalent rack?
Premium Solution Locked
Unlock all 148 answers & explanations
What two precautions must be taken when working with PowerScale equipment?
Premium Solution Locked
Unlock all 148 answers & explanations
Full Question Bank Locked
You have reached the end of the free study guide preview. Upgrade now to unlock all 148 questions and the full simulation engine.
Certification Path
Related Certifications
Customer Reviews
Global Community Feedback
David M.
"The practice engine is incredible. It feels exactly like the real testing environment and helped me build so much confidence."
Sarah J.
"The PDF is very well organized and the explanations for the answers are actually helpful, not just random text."
Michael C.
"I was skeptical, but the content is high quality and definitely worth the price. I passed on my first try!"