๐ŸŽ„

CertoMetrics - 15% OFF Special Discount Offer - Ends In:

0d 00h 00m 00s
Coupon code: SALE2026

Dell PowerScale Maintenance (D-PSC-MN-01)

Get full access to the updated question bank and confidently prepare for your exam.

Vendor

Dell

Certification

Storage

Content

148 Qs

Status

Verified

Updated

1 day ago

Test the Practice Engine

Experience our interactive testing environment with free demo questions

Launch Free Demo
Best Value Bundle

Premium Bundle

Complete Success Suite

$83 $49

Save $34 Instantly

  • โœ“
    Full PDF + Interactive Engine Everything you need to pass
  • โœ“
    All Advanced Question Types Drag & Drop, Hotspots, Case Studies
  • โœ“
    Priority 24/7 Expert Support Direct line to certification leads
  • โœ“
    90 Days Free Priority Updates Stay current as exams change

Success Metric

98.4% Pass Rate

Verified by 15k+ Students
Secure Checkout
Popular

Standard Simulation

Practice Engine

$44

One-Time Payment

  • Web-Based (Zero Install)
  • Real Testing Environment Virtual & Practice Modes
  • Interactive Engine Drag & Drop, Hotspots
  • 60 Days Free Updates

Compatible with All Devices

Chrome
Verified Secure Checkout

Basic Tier

PDF Study Guide

$39

Digital Access

  • โœ“ Exam Questions (PDF)
  • โœ“ Mobile Friendly
  • โœ“ 60 Days Updates
Download Free Sample PDF

Verified 30-Question Preview (D-PSC-MN-01)

Secure Checkout

Verified Community

The CertoMetrics Standard.

Recommend the #1 platform for verified Dell certification resources.

Success Network

Help a Colleague Succeed.

Invite a peer to get their own updated D-PSC-MN-01 prep kit.

Exam Overview

The Dell PowerScale Maintenance (D-PSC-MN-01) certification validates an individual's proficiency in maintaining and troubleshooting Dell PowerScale storage solutions. Achieving this certification demonstrates a critical understanding of PowerScale architecture, operational procedures, and best practices for ensuring system health, availability, and performance. This expertise is invaluable for minimizing downtime, optimizing resource utilization, and protecting vital data assets. Certified professionals are equipped to diagnose and resolve complex issues efficiently, perform essential upgrades, and manage system configurations, thereby contributing significantly to an organization's operational resilience and data integrity strategy. This credential elevates your professional standing, opening doors to advanced roles in enterprise storage management and solidifying your expertise in mission-critical storage infrastructure.

Questions

60

Passing Score

650/1000

Duration

90 Minutes

Difficulty

Intermediate

Level

Specialist

Skills Measured

PowerScale Architecture and Component Identification
System Monitoring, Alerts, and Health Management
Troubleshooting and Diagnostic Procedures
Routine Maintenance Operations and Upgrades
Data Protection and Recovery Methodologies

Career Path

Target Roles

Storage Administrator Systems Engineer Technical Support Engineer

Common Questions

Is the material up to date?

Yes. We update our question bank weekly to match the latest Dell standards. You get free updates for 90 days.

What format do I get?

You get instant access to both the **PDF** (for reading) and our **Premium Test Engine** (for exam simulation).

Is there a guarantee?

Absolutely. If you fail the D-PSC-MN-01 exam using our materials, we offer a full money-back guarantee.

When do I get the download?

Instantly. The download link is available in your dashboard immediately after payment is confirmed.

Free Study Guide Samples

Previewing updated D-PSC-MN-01 bank (30 Questions).

QUESTION 1

Refer to the exhibit.

An engineer replaces the drive in C1. They run the isi devices drive list command and obtain the output that is shown.

What action must the engineer take?

A
Run the isi devices drive add C1 command.
B
Run the isi devices drive format C1 command.
C
Update the firmware.
D
Contact Dell support.

Correct Option: D

โœ… Option D (Correct) Reasoning: The WRONG_TYPE state indicates that the installed drive is physically incompatible with the PowerScale node or bay. This cannot be resolved by software commands like add or format, nor by a firmware update. Contacting Dell support is necessary to identify the correct replacement drive part number and obtain the appropriate hardware.

โŒ Why the other choices are incorrect:


Option A is incorrect: isi devices drive add is used for integrating a newly detected, unformatted drive, not for rectifying a physical type mismatch.

Option B is incorrect: The isi devices drive format command prepares a drive for use, but it cannot change an incompatible drive's physical characteristics to make it compatible.

Option C is incorrect: Updating firmware addresses software-level compatibility or bug fixes for existing, compatible hardware; it will not resolve an incorrect physical drive type.



Reference: https://www.dell.com/support/manuals/en-us/isilon-onefs/cli-8.2.1-crg/isi-devices-drive-commands?guid=guid-3375c3d4-b816-43d9-952d-80517743d7c3&lang=en-us
QUESTION 2

Refer to the exhibit.

A platform engineer has connected power cables to a Dell PowerScale Gen6 node.

What does the status indicator indicate?

A
On and charging
B
Mismatch of voltage or component firmware
C
Standby and redundant
D
On and healthy

Correct Option: B

โœ… Option B (Correct) Reasoning: The image displays green AC and DC LEDs, indicating the power supply unit (PSU) is receiving AC input and providing DC output. However, the amber '!' (fault) LED is illuminated. This combination signifies that while power is present, the PSU is in a degraded or faulted state. A common cause for such a fault without complete power failure is a mismatch in voltage, power rating, or component firmware between the PSU and the node or other PSUs in the system.โŒ Why the other choices are incorrect:

Option A is incorrect: There is no indicator for 'charging' on a PowerScale node PSU, and the amber '!' indicates a fault, not a charging state.

Option C is incorrect: The green DC LED indicates the PSU is active and supplying power, not merely in standby. The amber '!' signifies a fault, not a redundant or standby status.

Option D is incorrect: While the green AC and DC LEDs confirm the unit is 'On', the illuminated amber '!' (fault) LED explicitly indicates that the PSU is not 'healthy'.



Reference: https://www.dell.com/support/manuals/en-us/isilon-f200/powerscale-f200-install-service/f200-front-panel-leds?guid=guid-3d3f9ec6-8c08-41ec-b0cf-530932ce761f
QUESTION 3

What is a prerequisite for installing the TPM after replacing the system board in a PowerScale F900?

A
Verify the compatibility of the old TPM with the new system board.
B
Keep the old TPM installed on the new system board.
C
Ensure that a new TPM is available for installation.

Correct Option: C

โœ… Option C (Correct) Reasoning: When a system board is replaced, the Trusted Platform Module (TPM) is cryptographically bound to the unique hardware configuration of the original board. For security and proper functionality, a new system board requires a new TPM or a fresh initialization to establish a new chain of trust.โŒ Why the other choices are incorrect:

Option A is incorrect: While physical compatibility is a factor, the fundamental issue is the TPM's security binding to the original system board, not just generic compatibility with the new board. Reusing an old TPM breaks the trust chain.

Option B is incorrect: Keeping the old TPM on a new system board is not supported practice. The security measurements and keys within the old TPM are tied to the previous board, leading to security errors or boot failures.



Reference: https://www.dell.com/support/kbdoc/en-us/000138096/poweredge-server-tpm-installation-and-troubleshooting
QUESTION 4

An engineer plans to install nodes to a cabinet with space for new hardware. All six PDU ports are occupied

What is the recommended way to support the new nodes in this cabinet?

A
Install four more PDUs to support the new nodes and future expansion.
B
Install one more PDU to support the new nodes.
C
Install two more PDUs to support the new nodes
D
Locate available PDU ports in the next cabinet.

Correct Option: C

โœ… Option C (Correct) Reasoning: Dell PowerScale nodes require redundant power, meaning each node's two power supplies must connect to separate Power Distribution Units (PDUs). If all existing PDU ports are occupied, installing two more PDUs ensures that new nodes can be connected with A/B power redundancy, aligning with best practices.โŒ Why the other choices are incorrect:

Option A is incorrect: Installing four more PDUs is excessive for simply supporting new nodes and may not be necessary for immediate needs or available cabinet space.

Option B is incorrect: Installing only one more PDU would not provide redundant power connections for new nodes, as each node requires two independent power feeds.

Option D is incorrect: Locating PDU ports in another cabinet is not the recommended approach when the goal is to install and support new nodes within the current cabinet, and it complicates cabling.



Reference: https://www.dell.com/support/manuals/en-us/isilon-f900/f600_f900_install_guide/power-specifications-and-requirements?guid=guid-15c23d06-c87a-42fc-8e4d-4d7a86fcfd58&lang=en-us
QUESTION 5

Which node is based on a Dell PowerEdge server?

A
F900
B
H700
C
F800
D
A300

Correct Option: A,B,D

โœ… Option A (Correct) Reasoning: The Dell PowerScale F900 nodes are part of the Gen 6 and later series, which are built upon Dell PowerEdge server platforms, offering high performance all-flash storage.โœ… Option B (Correct) Reasoning: The Dell PowerScale H700 nodes are hybrid storage nodes from the Gen 6 and later series. These nodes are designed to leverage Dell PowerEdge server architecture for balanced performance and capacity.โœ… Option D (Correct) Reasoning: The Dell PowerScale A300 nodes are archive storage nodes, also from the Gen 6 and later series. They are built upon Dell PowerEdge servers to provide cost-effective, high-capacity solutions.โŒ Why the other choices are incorrect:

Option C is incorrect: The F800 node is an older generation (Gen 5) Isilon all-flash node. It utilized a custom Isilon chassis and was not specifically marketed or architected as being 'based on a Dell PowerEdge server' in the same integrated manner as the Gen 6 and subsequent PowerScale nodes.



Reference: https://www.dell.com/en-us/dt/storage/powerscale/index.htm
QUESTION 6

Dell Technical Support has required a part be sent back to Dell Logistics to be studied.

Which process or document must be completed before sending the part back?

A
CDMR
B
WWFA
C
DMR
D
DTFA

Correct Option: C

โœ… Option C (Correct) Reasoning: The Defective Material Return (DMR) process is required before sending failed or defective parts back to Dell Logistics for study or replacement. Dell Technical Support initiates a DMR, providing specific authorization and instructions for the return shipment. โŒ Why the other choices are incorrect:

Option A is incorrect: CDMR (Customer Defective Material Return) is a specific categorization within the broader DMR process, making DMR the more fundamental and general answer for the required process.

Option B is incorrect: WWFA (World Wide Failure Analysis) refers to an internal Dell activity for analyzing returned parts, not the prerequisite document or process for shipping them.

Option D is incorrect: DTFA (Dell Technical Failure Analysis) is an internal Dell process for analyzing failures, not a document or process that must be completed prior to sending a part back.



Reference: https://www.dell.com/support/home/en-us
QUESTION 7

A platform engineer is adding a node to a Dell PowerScale cluster. The node is powered on and cabled.

What option is displayed once the serial connection to the node is established?

A
Reformat the node
B
Upgrade node firmware
C
Create a new cluster
D
Configure the network

Correct Option: D

โœ… Option D (Correct) Reasoning: When a new PowerScale node is powered on and connected via serial, the initial prompt focuses on configuring network parameters like IP address, subnet mask, and gateway. This fundamental step is essential for the node to communicate and become discoverable, enabling it to join an existing cluster.

โŒ Why the other choices are incorrect:

Option A is incorrect: Reformatting is typically an advanced operation for existing nodes, not the initial prompt for a new node at factory default.

Option B is incorrect: Firmware upgrades are usually performed after the node is part of a cluster and managed, not during initial network setup via serial.

Option C is incorrect: While creating a new cluster is an option, it requires prior network configuration for inter-node communication, making network configuration the more immediate and foundational serial console step.



Reference: https://www.dell.com/support/kbdoc/en-us/000021371/dell-emc-powerscale-onefs-9-5-cli-administration-guide
QUESTION 8

What is the isi devices node smartfail command used for?

A
Failover a node
B
Remove a node
C
Add a node
D
Failback a node.

Correct Option: B

โœ… Option B (Correct) Reasoning: The isi devices node smartfail command is used to initiate a controlled removal of a node from a Dell PowerScale cluster. It triggers data re-protection, moving all data from the specified node to other healthy nodes before the node is physically removed or taken offline.โŒ Why the other choices are incorrect:

Option A is incorrect: Failover typically refers to a system automatically switching to a redundant component during a failure, which is not the primary function of smartfail.

Option C is incorrect: Adding a node involves different commands and procedures to integrate a new node into the cluster, not smartfail.

Option D is incorrect: Failback implies returning a system to its primary operational state after a failover, which is the opposite of smartfail's purpose.



Reference: https://www.dell.com/support/manuals/en-us/isilon-onefs/onefs-cli-admin-guide-9.5/managing-nodes?guid=guid-3d3f9453-6a2c-4f7f-be9d-f213b3c3c13b&lang=en-us
QUESTION 9

What is recommended when replacing the M.2 card in a PowerScale Gen6 system?

A
Ignore the battery pack and cable.
B
Keep the battery caddy connected.
C
Remove the battery pack and disconnect the cable.
D
Leave the HBA riser in place.

Correct Option: C

โœ… Option C (Correct) Reasoning: When replacing internal components like an M.2 card in a PowerScale Gen6 system, removing the battery pack and disconnecting its cable is a critical safety measure. This ensures the system is completely depowered, preventing electrical hazards or accidental damage during maintenance.โŒ Why the other choices are incorrect:

Option A is incorrect: Ignoring active power sources like battery packs is unsafe and risks electrical shorts or component damage during internal hardware procedures.

Option B is incorrect: Keeping the battery caddy connected means the battery remains a live power source, which violates fundamental safety protocols for working inside server hardware.

Option D is incorrect: The HBA riser often obstructs access to other internal components, including M.2 slots, and typically requires removal to facilitate proper and safe replacement procedures in a PowerScale Gen6 node.



Reference: https://www.dell.com/support/manuals/en-us/powerscale-f800/powerscale_f800_servicemanual
QUESTION 10

Which port is used for the WebUI on a Dell PowerScale cluster?

A
9443
B
22
C
8080
D
8443

Correct Option: D

โœ… Option D (Correct) Reasoning: The Dell PowerScale OneFS WebUI defaults to port 8443 for secure HTTPS access. This port is specifically used for the web administration interface to ensure encrypted communication.โŒ Why the other choices are incorrect:

Option A is incorrect: Port 9443 is not the standard or default port for the Dell PowerScale OneFS WebUI.

Option B is incorrect: Port 22 is reserved for SSH (Secure Shell) command-line access, not for the graphical WebUI.

Option C is incorrect: While port 8080 can be used for the WebUI over HTTP, 8443 is the default for secure HTTPS access, which is the standard and recommended method for management.



Reference: https://infohub.delltechnologies.com/t/powerscale-onefs/
QUESTION 11

What is the purpose of SolVe Desktop?

A
Provide customers with instructions for diagnosing hardware, replacing CRU and FRU hardware items, and updating the cluster after replacing parts.
B
Provide a laptop connection to gather logs, perform pre-upgrade checks, install firmware and patches, and import data back to Dell support for analysis.
C
Provide centralized access to step-by-step procedures while offline or in high-security locations.
D
Provide access to the latest OneFS codes and firmware packages to download during hardware installation.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 12

What is recommended when connecting the power cables to a new 4U chassis?

A
Connect members of a node pair to different power sources.
B
Connect individual chassis to alternating power sources.
C
Connect each node in a chassis to one of four different PDUs.
D
Connect one node pair to one power source and the other node pair to a different power source.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 13

What must be verified during the installation of a fully populated Titan-HD rack with H7000 nodes?

A
There are at least four people available to lift each node.
B
Proper DC power is being supplied to the rack.
C
The correct number of hard drives have been shipped.
D
The data center floor is rated to support 1588 kg (3,500 lb).

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 14

A customer wants to create a cluster mixing F600 and A300 nodes.

What is the minimum number of each node type that they need to build the cluster?

A
4x F6004x A300
B
4x F6003x A300
C
3x F6004x A300
D
2x F6002x A300

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 15

What is the main purpose of the vault operation in PowerScale F200, F600 and F900?

A
Erasure of data from NVDIMM flash during the restore process.
B
Transfers data from DRAM to NVDIMM flash and conversely during BIOS startup
C
Handles storing data in NVDIMM flash from DRAM

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 16

An engineer runs the isi status command.

What are they trying to accomplish?

A
Obtain the health of the cluster.
B
Show cluster CPU performance.
C
Show cluster network performance
D
Obtain the health of the drives in the cluster.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 17

A customer wants to add SSDs to the drive sleds in a Dell PowerScale H600 node for expanded caching.

What should the platform engineer tell the customer?

A
Caching SSDs are placed in dedicated slots in the compute module.
B
Each node sled must have an equal number of caching SSDs.
C
Only F200, F600, F810 nodes can use SSDs.
D
Cache expansion requires a Dell Professional Services engagement.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 18

A platform engineer is replacing a failed Dell PowerScale Gen6 node at a customer site. They remove all cables from the compute module and observe that some of the LEDs inside the node are lit.

What action must the platform engineer take?

A
Contact technical support.
B
Wait until the node is shut down.
C
Shut down the partner node before proceeding.
D
Continue on to the next step.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 19

Following Dell best practices, which external network ports should be used on PowerScale A300 or A3000 nodes?

A
1/25 GbE or 20/40 GbE
B
10/40 GbE or 1/100 GbE
C
10/25 GbE or 40/100 GbE
D
1/100 GbE or 10/25 GbE

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 20

A Dell PowerScale H400 node has one SSD installed. The SSD has failed and must be replaced.

Where must the new drive be installed?

A
Position 0 on sled A
B
Right slot at the back of the node
C
Left slot at the back of the node
D
Position 4 on sled A

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 21

What is the minimum amount of clearance space needed when unpacking the components pallet?

A
3.1 meters (10 feet)
B
2.4 meters (8 feet)
C
3.7 meters (12 feet)
D
1.8 meters (6 feet)

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 22

What is the minimum OneFS version required to support PowerScale P100 and B100 Accelerator nodes?

A
9.0
B
9.4
C
9.2
D
9.3
E
9.1

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 23

What is the maximum number of nodes an engineer can scale in a PowerScale Gen6 cluster?

A
128
B
252
C
126
D
256

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 24

Which administrative task can be performed using the front panel of a Dell PowerScale F800 node?

A
Reboot the node.
B
Smartfail the node.
C
Check drive capacity.
D
Add the node to a cluster.

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 25

What two pieces of information of a node network interface can the ifconfig command be used to obtain?

A
MAC address
B
GW address
C
WWN number
D
MTU size

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 26

A customer is upgrading their PowerScale system. They want to have a smaller maintenance window and not introduce service outages.

Which upgrade method is recommended?

A
Automated upgrades
B
Rolling upgrades
C
Simultaneous upgrades
D
Parallel upgrades

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 27

What port configuration does backend switch model S5232-ON support?

A
52-port 32 GbE
B
52-port 100 GbE
C
32-port 52 GbE
D
32-port 100 GbE

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 28

Which upgrade method is fastest to complete when a cluster service outage is allowed?

A
Rolling
B
Automated
C
Simultaneous
D
Parallel

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 29

How much rack space should be left open under an A3000 node when using a cable management tray in a customer-supplied Titan-HD equivalent rack?

A
2U
B
4U
C
3U
D
1U

Premium Solution Locked

Unlock all 148 answers & explanations

QUESTION 30

What two precautions must be taken when working with PowerScale equipment?

A
Open or remove the system cover only while the node is powered off.
B
Remove blanking pieces installed during shipping.
C
Use an anti-static mat and wristband while working with FRUs.
D
Operate the system without the cover for a maximum of 10 minutes when testing.
E
Use a server lift to prevent personal injury and equipment damage.

Premium Solution Locked

Unlock all 148 answers & explanations

Full Question Bank Locked

You have reached the end of the free study guide preview. Upgrade now to unlock all 148 questions and the full simulation engine.

Customer Reviews

5 / 5
(15,000+ verified)
5
100%
4
0%
3
0%
2
0%
1
0%

Global Community Feedback

DM

David M.

Verified Student

"The practice engine is incredible. It feels exactly like the real testing environment and helped me build so much confidence."

SJ

Sarah J.

Premium Member

"The PDF is very well organized and the explanations for the answers are actually helpful, not just random text."

MC

Michael C.

Verified Buyer

"I was skeptical, but the content is high quality and definitely worth the price. I passed on my first try!"

Need Assistance?

> Our expert support team is available to assist you with any inquiries about our exam materials.

Contact Support
Average response: < 24 Hours

Get Exam Updates

> Subscribe to receive instant notifications on new questions and exclusive flash sales.

* Join 5,000+ students getting weekly updates

Support Chat โ— Active Now

๐Ÿ‘‹ Hi! How can we help you pass your exam?

Enter email to start chatting