Huawei HCSA-Presales-Data Center Facility (Modular DC) V1.0 (H19-132_V1.0)
Get full access to the updated question bank and confidently prepare for your exam.
Vendor
Huawei
Certification
Sales & Presales
Content
107 Qs
Status
Verified
Updated
10 hours ago
Test the Practice Engine
Experience our interactive testing environment with free demo questions
Premium Bundle
Complete Success Suite
Save $34 Instantly
-
✓Full PDF + Interactive Engine Everything you need to pass
-
✓All Advanced Question Types Drag & Drop, Hotspots, Case Studies
-
✓Priority 24/7 Expert Support Direct line to certification leads
-
✓90 Days Free Priority Updates Stay current as exams change
Success Metric
98.4% Pass Rate
Standard Simulation
Practice Engine
One-Time Payment
-
Web-Based (Zero Install)
-
Real Testing Environment Virtual & Practice Modes
-
Interactive Engine Drag & Drop, Hotspots
-
60 Days Free Updates
Compatible with All Devices
Basic Tier
PDF Study Guide
Digital Access
- ✓ Exam Questions (PDF)
- ✓ Mobile Friendly
- ✓ 60 Days Updates
Verified 22-Question Preview (H19-132_V1.0)
Verified Community
The CertoMetrics Standard.
Recommend the #1 platform for verified Huawei certification resources.
Success Network
Help a Colleague Succeed.
Invite a peer to get their own updated H19-132_V1.0 prep kit.
Exam Overview
The Huawei HCSA-Presales-Data Center Facility (Modular DC) V1.0 certification is a foundational credential for professionals looking to demonstrate their expertise in Huawei's cutting-edge modular data center solutions. Achieving this certification validates your understanding of modular data center concepts, key technologies, and Huawei's specific product offerings, enabling you to effectively articulate their value to clients. This credential is vital for presales engineers, technical consultants, and solution architects who need to design, propose, and support highly efficient, reliable, and scalable data center infrastructure. It significantly enhances your professional credibility, opening doors to advanced roles and opportunities within the rapidly evolving data center industry and solidifying your position as a trusted advisor in modern IT infrastructure.
Questions
60
Passing Score
600/1000
Duration
90 Minutes
Difficulty
Intermediate
Level
Associate
Skills Measured
Career Path
Target Roles
Common Questions
Is the material up to date?
Yes. We update our question bank weekly to match the latest Huawei standards. You get free updates for 90 days.
What format do I get?
You get instant access to both the **PDF** (for reading) and our **Premium Test Engine** (for exam simulation).
Is there a guarantee?
Absolutely. If you fail the H19-132_V1.0 exam using our materials, we offer a full money-back guarantee.
When do I get the download?
Instantly. The download link is available in your dashboard immediately after payment is confirmed.
Free Study Guide Samples
Previewing updated H19-132_V1.0 bank (22 Questions).
Which of the following is a quality feature?
Correct Option: D
✅ Option D (Correct) Reasoning: Safety, Reliability, and Serviceability are fundamental pillars of quality for any data center facility, including modular designs. Safety ensures the protection of personnel and assets. Reliability guarantees continuous, uninterrupted operation. Serviceability allows for efficient maintenance, upgrades, and issue resolution without significant downtime. Since all three are critical quality aspects, "All of the above" is the most comprehensive and appropriate answer.❌ Why the other choices are incorrect:
Option A is incorrect: Safety is indeed a critical quality feature, but it is not the only one among the given options that contributes to overall data center quality.
Option B is incorrect: Reliability is an essential quality feature, yet it alone does not represent the full scope of quality considerations for a data center.
Option C is incorrect: Serviceability is a vital quality feature for operational efficiency and ease of maintenance, but it is not the sole aspect of quality presented here.
Reference: https://e.huawei.com/en/products/digital-power/modular-data-center/fusionmodule2000
Which of the following are incorrect about the “capability of safety and quality planning” in the “four capabilities” of SQA professional skills? (Choose all that apply.)
Correct Option: B,C
✅ Option B (Correct) Reasoning: SQA's role is to assure quality and process adherence, not to be the primary owner of project quality planning. This responsibility typically lies with the project manager and the project team.✅ Option C (Correct) Reasoning: Quality planning is a collaborative effort involving various stakeholders, including the project manager, development team, and testing team. It is not completed independently by SQA.❌ Why the other choices are incorrect:
Option A is incorrect: This statement accurately defines quality planning, outlining its objectives and scope. Thus, it is a correct statement about quality planning.
Option D is incorrect: This statement correctly emphasizes the importance of clear communication and preparedness through planning for successful project delivery. Thus, it is a correct statement about quality planning.
Which of the following information must be verified before creating a BOQ?
Correct Option: B
✅ Option B (Correct) Reasoning: The 'Point of Opportunity Information' encompasses critical details such as project scope, technical requirements, site conditions, and specific customer needs. This foundational data directly dictates the items, quantities, and specifications necessary for an accurate Bill of Quantity (BOQ) creation. Without this verified information, a detailed and correct BOQ cannot be generated.
❌ Why the other choices are incorrect:
Option A is incorrect: While the customer name is essential for documentation, it provides no technical or quantitative information required to populate the BOQ with products and services.
Option C is incorrect: The country is important for local pricing, taxes, and logistics, but it does not define the actual components or services that constitute the core of the BOQ.
Option D is incorrect: The BOQ name is an administrative detail assigned for identification and organization, typically during or after the BOQ content is being determined, not a prerequisite for gathering its core data.
Reference: https://e.huawei.com/en/talent/#/cert/product-details?certifiedProductId=220&version=V1.0
The front door of the FusionModule800 is equipped with a double glass door.
Which of the following functions can be implemented?
Correct Option: A
✅ Option A (Correct) Reasoning: Double glass doors feature an insulating air gap between panes, significantly reducing heat transfer. This is crucial for separating the cold aisle (front of the rack) from ambient temperatures, maintaining optimal cooling efficiency within the FusionModule800. ❌ Why the other choices are incorrect:
Option B is incorrect: While two panes of glass provide more structural rigidity than one, 'stronger' is not the primary function or design driver for using a double glass door in a data center module; thermal insulation is the key benefit.
Option C is incorrect: Double glass offers some noise reduction due to the air gap. However, the principal engineering purpose of a double glass door in a data center, especially for the front of a module, is thermal management and insulation, not primarily noise reduction.
Reference: https://e.huawei.com/en/products/digital-power/data-center-facility/modular-data-center/fusionmodule800
Which of the following products are the main components of the FusionModule2000 power supply and distribution system? (Choose all that apply.)
Correct Option: C,E
✅ Option C (Correct) Reasoning: The UPS (Uninterruptible Power Supply) is a core component of the FusionModule2000's power supply system, providing stable power and battery backup to critical IT loads.✅ Option E (Correct) Reasoning: The PDC (Power Distribution Cabinet) is essential for the FusionModule2000's power distribution system, distributing power from the UPS to individual IT equipment racks.❌ Why the other choices are incorrect:
Option A is incorrect: NetCol5000 is a cooling product, not part of the power supply and distribution system.
Option B is incorrect: NetEco6000 is a data center infrastructure management (DCIM) system, not a power supply component.
Option D is incorrect: ECC800-Pro is an environment monitoring and control unit, not a power supply and distribution component.
Reference: https://e.huawei.com/en/products/digital-power/modular-data-center/fusionmodule2000
FusionDC1000A-40ft in the N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).
Correct Option: A
✅ Option A (Correct) Reasoning: The Huawei FusionDC1000A-40ft is a modular data center solution designed for flexible power configurations. It commonly supports dual ATS (Automatic Transfer Switch) inputs for enhanced power reliability. Its modular UPS system allows for various power capacities. A 60 kVA capacity can be achieved using two 30 kVA UPS modules in a 2+0 configuration, where both modules are active and provide the total load without N+1 redundancy for the entire 60kVA. This aligns with standard product capabilities.❌ Why the other choices are incorrect:
Option B is incorrect: The statement accurately describes a feasible and common configuration for the FusionDC1000A-40ft. Dual ATS inputs are a standard reliability feature, and a 60 kVA capacity with a 2+0 UPS configuration (e.g., two 30 kVA modules) is a valid implementation.
Reference: https://e.huawei.com/us/products/network-energy/modular-data-center/fusiondc1000a
What temperature scenarios does the FusionDC1000A prefabricated integrated data center support? (Choose all that apply.)
Correct Option: A
✅ Option A (Correct) Reasoning: The Huawei FusionDC1000A prefabricated integrated data center is engineered for robust outdoor deployment. Its official technical specifications confirm an operating temperature range of -40°C to +55°C, ensuring reliable performance across diverse environmental conditions.❌ Why the other choices are incorrect:
Option B is incorrect: This range does not encompass the full lower operating temperature limit of -40°C supported by the FusionDC1000A.
Option C is incorrect: This range does not encompass the full upper operating temperature limit of +55°C supported by the FusionDC1000A.
Option D is incorrect: This range excludes both the lowest supported temperature of -40°C and the highest supported temperature of +55°C.
Reference: https://e.huawei.com/us/products/network-energy/data-center-facility/modular-data-center/fusiondc1000a
In FusionModule2000, what are the advantages of intelligent busbars compared to traditional end of suite solutions? (Choose all that apply.)
Correct Option: A, B, C, D
✅ Option A (Correct) Reasoning: FusionModule2000's intelligent busbars enable flexible power expansion. Their modular, plug-and-play design allows easy addition or removal of power modules and IT racks, adapting efficiently to future capacity.✅ Option B (Correct) Reasoning: Intelligent busbars in FusionModule2000 increase cabinet space. By replacing bulky traditional cabling with integrated busbar systems, more internal volume becomes available for IT equipment, optimizing rack utilization.✅ Option C (Correct) Reasoning: Intelligent busbars significantly reduce power distribution loss. With lower resistance and impedance than cables, they minimize energy waste, enhancing overall power efficiency and reducing operating expenditures.✅ Option D (Correct) Reasoning: FusionModule2000's intelligent busbars are easy to install. Their modular, quick-connect design facilitates "plug-and-play" deployment, dramatically reducing installation time and labor compared to conventional wiring.
Reference: https://e.huawei.com/en/products/digital-power/modular-data-center/fusionmodule2000
What are the BOQ transfer modes provided by Meta CPQ? (Choose all that apply.)
Correct Option: A, B, C
✅ Option A (Correct) Reasoning: Sharing the BOQ allows other users to access and collaborate on it within Meta CPQ, facilitating team review and collective input. This transfers visibility and collaborative rights effectively.✅ Option B (Correct) Reasoning: Submitting the BOQ progresses it through a workflow, typically for approval, final pricing, or conversion into an order. This formal transfer initiates subsequent business processes and stages.✅ Option C (Correct) Reasoning: Exporting the BOQ creates a downloadable file (e.g., Excel, PDF) for use outside the Meta CPQ system. This enables external sharing, archiving, or integration with other tools.
Reference: https://e.huawei.com/en/solutions/digital-transformation/business-support-system/overview
You can add a configuration model in the favorites to any BOQ.
Correct Option: A
✅ Option A (Correct) Reasoning: In modular data center configuration tools, saving frequently used or standardized configuration models as 'favorites' is a common feature. This allows users to efficiently reuse these saved models across various Bill of Quantity (BOQ) projects, significantly streamlining the design and quotation process for different requirements. ❌ Why the other choices are incorrect:
Option B is incorrect: The ability to save configuration models as favorites and apply them to any BOQ is a fundamental feature of advanced configuration and quotation platforms, designed to enhance efficiency and consistency in proposal generation by enabling reusability.
Reference: https://e.huawei.com/en/products/digital-power/data-center-facility/modular-data-center/fusionmodule2000
Crosby proposed the zero defect (ZD) concept.
Premium Solution Locked
Unlock all 107 answers & explanations
Which of the following Sparts can be ordered in the SCT?
Premium Solution Locked
Unlock all 107 answers & explanations
The lithium battery version of FusionDC1000A-40ft-IT is equipped with __________ IT racks for 2N configuration. (Choose all that apply.)
Premium Solution Locked
Unlock all 107 answers & explanations
What is the maximum power of a single FusionModule800 module?
Premium Solution Locked
Unlock all 107 answers & explanations
How many typical cabinet configurations does the FusionModule800 5.0 provide to meet different customer requirements for standard 380V power?
Premium Solution Locked
Unlock all 107 answers & explanations
FusionModule500 is equipped with a built-in fire suppression module, 1U in height, using perfluorohexanone (PFH) extinguishing gas.
Premium Solution Locked
Unlock all 107 answers & explanations
What features does the cooling system of the FusionDC1000A-40ft-IT have? (Choose all that apply.)
Premium Solution Locked
Unlock all 107 answers & explanations
HUAWEI FusionDC1000 Prefabricated Modular Data Center Solution includes _____. (Choose all that apply.)
Premium Solution Locked
Unlock all 107 answers & explanations
If you use Meta CPQ for the first time, you need to apply for an account and related permissions.
Premium Solution Locked
Unlock all 107 answers & explanations
Which of the following is not a quick quotation method provided by Meta CPQ?
Premium Solution Locked
Unlock all 107 answers & explanations
Which of the following are included in the SQA LBPGP role model? (Choose all that apply.)
Premium Solution Locked
Unlock all 107 answers & explanations
What does "yellow" in the safety color indicate?
Premium Solution Locked
Unlock all 107 answers & explanations
Full Question Bank Locked
You have reached the end of the free study guide preview. Upgrade now to unlock all 107 questions and the full simulation engine.
Certification Path
Related Certifications
Customer Reviews
Global Community Feedback
David M.
"The practice engine is incredible. It feels exactly like the real testing environment and helped me build so much confidence."
Sarah J.
"The PDF is very well organized and the explanations for the answers are actually helpful, not just random text."
Michael C.
"I was skeptical, but the content is high quality and definitely worth the price. I passed on my first try!"