Huawei HCSP-Field-Data Center Facility V1.0 (H20-923_V1.0)

Get full access to the updated question bank and confidently prepare for your exam.

Vendor

Huawei

Certification

ICT Infrastructure

Content

60 Qs

Status

Verified

Updated

2 days ago

Test the Practice Engine

Experience our interactive testing environment with free demo questions

Launch Free Demo
Best Value Bundle

Premium Bundle

Complete Success Suite

$83 $49

Save $34 Instantly

  • โœ“
    Full PDF + Interactive Engine Everything you need to pass
  • โœ“
    All Advanced Question Types Drag & Drop, Hotspots, Case Studies
  • โœ“
    Priority 24/7 Expert Support Direct line to certification leads
  • โœ“
    90 Days Free Priority Updates Stay current as exams change

Success Metric

98.4% Pass Rate

Verified by 15k+ Students
Secure Checkout
Popular

Standard Simulation

Practice Engine

$44

One-Time Payment

  • Web-Based (Zero Install)
  • Real Testing Environment Virtual & Practice Modes
  • Interactive Engine Drag & Drop, Hotspots
  • 60 Days Free Updates

Compatible with All Devices

Chrome
Verified Secure Checkout

Basic Tier

PDF Study Guide

$39

Digital Access

  • โœ“ Exam Questions (PDF)
  • โœ“ Mobile Friendly
  • โœ“ 60 Days Updates
Download Free Sample PDF

Verified 12-Question Preview (H20-923_V1.0)

Secure Checkout

Verified Community

The CertoMetrics Standard.

Recommend the #1 platform for verified Huawei certification resources.

Success Network

Help a Colleague Succeed.

Invite a peer to get their own updated H20-923_V1.0 prep kit.

Exam Overview

The Huawei HCSP-Field-Data Center Facility V1.0 certification validates an individual's advanced expertise in the critical domain of data center infrastructure. This professional-level exam focuses on the practical planning, deployment, operation, and maintenance of Huawei's state-of-the-art data center facilities. Earning this certification demonstrates a deep understanding of essential components such as power supply and distribution, cooling systems, structured cabling, and comprehensive monitoring solutions. It signifies proficiency in ensuring high availability, energy efficiency, and operational excellence for modern data centers. For field engineers and ICT professionals, this credential is invaluable, enhancing career opportunities and establishing credibility in managing complex data center environments, ultimately contributing to the reliability and performance of digital infrastructure.

Questions

60

Passing Score

600/1000

Duration

90 Minutes

Difficulty

Intermediate / Professional

Level

Professional

Skills Measured

Data Center Infrastructure Planning and Design: Understanding data center architecture, standards (TIA-942, ISO 22237), site selection, capacity planning, and overall layout considerations for Huawei data center solutions.
Power Supply and Distribution Systems: Proficiency in UPS systems (modular, traditional), battery configurations, power distribution units (PDUs), generator sets, grounding systems, and surge protection specific to data center environments.
Cooling Systems and Management: Expertise in various cooling technologies including CRAC/CRAH units, chillers, hot/cold aisle containment, liquid cooling, and efficient thermal management strategies for data centers.
Cabling and Connectivity Solutions: Knowledge of structured cabling systems (fiber optic and copper), cable management best practices, network infrastructure deployment, and physical security measures within the data center.
Monitoring, Operation, and Maintenance: Understanding Data Center Infrastructure Management (DCIM) systems, environmental monitoring, fire suppression systems, access control, and routine operational procedures and maintenance protocols for facility components.

Career Path

Target Roles

Data Center Field Engineer Data Center Operations Specialist ICT Infrastructure Consultant

Common Questions

Is the material up to date?

Yes. We update our question bank weekly to match the latest Huawei standards. You get free updates for 90 days.

What format do I get?

You get instant access to both the **PDF** (for reading) and our **Premium Test Engine** (for exam simulation).

Is there a guarantee?

Absolutely. If you fail the H20-923_V1.0 exam using our materials, we offer a full money-back guarantee.

When do I get the download?

Instantly. The download link is available in your dashboard immediately after payment is confirmed.

Free Study Guide Samples

Previewing updated H20-923_V1.0 bank (12 Questions).

QUESTION 1

During routine maintenance of the lithium battery cabinet, which of the following areas should be protected from electric shocks caused by exposed hands or metal objects? (Choose all that apply.)

A
Battery general positive terminal
B
Battery negative terminal
C
Short-circuit copper bar between battery modules
D
Battery positive terminal
E
Battery general negative terminal

Correct Option: A,B,C,D,E

During routine maintenance of a lithium battery cabinet, all terminals and interconnections within the live battery circuit carry significant voltage and current, posing a risk of electric shock or short circuit. This includes the battery general positive terminal (A), battery negative terminal (B), short-circuit copper bar between battery modules (C), battery positive terminal (D), and battery general negative terminal (E). Any exposed conductive part of the battery system should be treated as live and protected from accidental contact by hands or metal objects to ensure safety.

Reference: https://support.huawei.com/enterprise/en/doc/EDOC1100234470/a52467d0/safety-precautions

QUESTION 2

Which of the following statements are true about the routine maintenance of a UPS?

A
Environment check: Check whether the temperature and humidity of the equipment room meet the recommended environment requirements. Check whether the equipment room is clean and tidy.
B
UPS status check: Check whether the UPS works in normal mode, whether an alarm is generated, and whether the UPS is in a proper load.
C
Routine maintenance of vulnerable components: Periodically check the UPS fan operation, whether there is noise, and whether the rotation speed is abnormal.
D
If there is no alarm on the UPS panel, do not need to check the installation environment, temperature, and humidity onsite.

Correct Option: A,B,C

Routine maintenance of an Uninterruptible Power Supply (UPS) is crucial for ensuring its reliability and longevity. The statements A, B, and C correctly describe essential aspects of such maintenance:

  • Option A: Environment checks, including temperature, humidity, and cleanliness, are fundamental as these factors directly impact the performance and lifespan of UPS components, especially batteries and electronics.
  • Option B: Regularly checking the UPS's operating status (normal mode, alarms, load level) is vital to identify immediate operational issues or potential overloads that could compromise power delivery.
  • Option C: Vulnerable components like fans require periodic inspection for proper operation, noise, and speed. Malfunctioning fans can lead to overheating, which is detrimental to the UPS system.

Option D is incorrect: Relying solely on UPS panel alarms for environmental issues is a reactive approach. Proactive routine checks of the installation environment, temperature, and humidity are necessary preventive measures, even in the absence of alarms, to detect gradual degradation or potential problems before they escalate or trigger a system alert.



Reference: https://www.eaton.com/content/dam/eaton/products/backup-power-ups-surge-it-power-distribution/eaton-powerware-ups-services/service-brochures/power_advantage_maintenance_brochure_web_lr.pdf
QUESTION 3

Which of the following is not a scenario-based solution for Huawei data center products?

A
FusionDC800
B
FusionDC1000
C
FusionModule500
D
FusionModule2000

Correct Option: A

Based on Huawei's product naming conventions and current data center solution portfolio, the correct answer is A. FusionDC800.

Here is a breakdown of why this is the case:

A. FusionDC800: There is no standard "FusionDC800" product in Huawei's data center facility portfolio. Huawei offers the FusionModule800, which is a small modular data center solution, but it is not branded as a "FusionDC" series product.

B. FusionDC1000: This is a recognized series of Huawei prefabricated all-in-one modular data center solutions (e.g., FusionDC1000A, FusionDC1000C) designed for various outdoor and edge scenarios.

C. FusionModule500: This is a recognized Huawei edge data center solution, marketed as an "all-in-one" cabinet-based modular data center ("One Cabinet One DC").

D. FusionModule2000: This is a widely recognized Huawei smart modular data center solution designed for small- to medium-sized data centers, offering a highly integrated system of power, cooling, and management.

QUESTION 4

The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.

A
TRUE
B
FALSE

Correct Option: A

The Huawei UPS5000-H series, particularly the high-capacity models like the 1200 kVA and 1600 kVA, are designed with a modular architecture to support large data center loads. According to Huawei's product specifications and documentation for the UPS5000-H series, these configurations indeed consist of two power cabinets to accommodate the necessary power modules and one dedicated bypass cabinet for the static bypass switch. Furthermore, these sophisticated UPS systems are equipped with essential auxiliary components for comprehensive management and protection. The MDU (Monitoring Display Unit) provides local display and control capabilities. A surge protection box is crucial for safeguarding the equipment against power transients. The ECU (Environmental Control Unit) typically refers to an embedded control unit that manages the overall system operation and environmental aspects relevant to the UPS, ensuring reliable performance. Therefore, the statement accurately describes the standard configuration and components of the UPS5000-H-1200 kVA and UPS5000-H-1600 kVA models.



Reference: https://e.huawei.com/en/products/digital-power/ups/ups5000-h
QUESTION 5

Huawei-developed intelligent rPDU (PDU2000M) can replace the original UIM20A expansion module. The rPDU can connect to the cabinet T/H sensors, U space managers, and door status sensors.

A
TRUE
B
FALSE

Correct Option: A

The Huawei-developed intelligent rPDU (PDU2000M) is designed for comprehensive power distribution and monitoring within data center racks. A key feature of modern intelligent PDUs, including the PDU2000M, is the integration of environmental monitoring capabilities. This means the rPDU can directly connect to cabinet temperature and humidity (T/H) sensors and door status sensors to provide real-time environmental and security monitoring at the rack level. This consolidation of functions allows the PDU2000M to effectively replace dedicated, simpler monitoring modules like the UIM20A for many rack-level monitoring tasks, simplifying the overall architecture. Furthermore, in Huawei's integrated data center solutions, intelligent PDUs are often part of a broader management ecosystem that supports asset management, which can include interfacing with 'U space managers' or providing data that contributes to U-space utilization monitoring. Therefore, the statement is correct.

Reference: https://e.huawei.com/en/products/digital-power/modular-data-center/fusionmodule2000

QUESTION 6

Which of the following is the procedure for replacing a damaged UPS power module onsite?

1. Rotate the ready switch to the on state, remove the four screws that fix the module, wait for half a minute, and remove the module for maintenance.

2. Rotate the ready switch to the off state, remove the four screws that fix the module, wait for half a minute, and remove the module for maintenance.

3. Before inserting the module into the cabinet, ensure that the ready switch is in the on state, and then place the module in the corresponding position of the cabinet. Slowly and evenly insert the module until it is fully seated. Tighten the four screws and rotate the ready switch to the off state.

4. Before inserting the module into the cabinet, ensure that the ready switch is in the off state, and then place the module in the corresponding position of the cabinet. Slowly and evenly insert the module until it is fully seated. Tighten the four screws and rotate the ready switch to the on state.

A
1, 3
B
1, 4
C
2, 3
D
2, 4

Correct Option: D

When replacing a damaged UPS power module, adhering to proper safety and operational procedures is crucial to prevent equipment damage or personal injury. The correct procedure involves:

  1. For removal: The module's ready switch must be rotated to the 'off' state before attempting removal. This ensures the module is safely de-energized, preventing electrical hazards and allowing for a safe hot-swap if applicable. Option 2 correctly states: "Rotate the ready switch to the off state, remove the four screws that fix the module, wait for half a minute, and remove the module for maintenance."
  2. For insertion: Before inserting a new module, its ready switch should be in the 'off' state. This prevents arcing or sudden power surges during insertion. Once the module is fully seated and secured (screws tightened), the ready switch can then be turned to the 'on' state to power up the module and integrate it into the UPS system. Option 4 correctly states: "Before inserting the module into the cabinet, ensure that the ready switch is in the off state, and then place the module in the corresponding position of the cabinet. Slowly and evenly insert the module until it is fully seated. Tighten the four screws and rotate the ready switch to the on state."

Therefore, options 2 and 4 describe the correct procedures for removal and insertion, respectively.



Reference: https://e.huawei.com/us/products/network-energy/ups/data-center-ups
QUESTION 7

If the startup password authentication for a smart module is not complete, the ECC800-Pro WebUI and app cannot be used for commissioning.

A
TRUE
B
FALSE

Correct Option: A

The statement is TRUE. For robust security and proper system operation, initial password authentication for a smart module is a mandatory prerequisite. Before the ECC800-Pro WebUI and mobile app can be used for commissioning (i.e., configuration, testing, and bringing the system into operation), all critical startup security procedures, including setting up secure passwords, must be completed. This ensures that only authorized personnel can access and configure the sensitive data center infrastructure, preventing unauthorized access and potential security breaches during the critical commissioning phase. Failing to complete this step would typically result in restricted access or prevent the commencement of full configuration and management via the user interfaces.

Reference: https://support.huawei.com/enterprise/en/doc/EDOC1100086884/df164501/getting-started

QUESTION 8

Which of the following can be used to start the inverter of the UPS5000-H? (Choose all that apply.)

A
UPS WebUI
B
ECC
C
UPS LCD
D
NetEco

Correct Option: A,C,D

Official explanation included in the full bundle.

QUESTION 9

If the SPD indicator of a smart module is green, the SPD is running properly. If the SPD indicator is red, the SPD is faulty and must be replaced immediately.

A
TRUE
B
FALSE

Correct Option: A

The statement accurately describes the standard operational indicators for Surge Protective Devices (SPDs) commonly found in smart modules and other power distribution equipment within data centers. A green indicator signifies that the SPD is functioning correctly and providing protection against power surges. Conversely, a red indicator denotes that the SPD has failed, is no longer capable of providing protection, and must be promptly replaced to ensure the continued safety and reliability of the connected equipment. This aligns with industry standards and Huawei's implementation for SPD status.



Reference: https://e.huawei.com/en/products/digital-power/data-center/smart-modular-data-center
QUESTION 10

When the mains supply is stable, the UPS5000-H mainly works in __________ mode after ECO is configured.

A
Battery
B
Normal
C
Static bypass
D
Maintenance bypass

Correct Option: C

Official explanation included in the full bundle.

QUESTION 11

Which of the following is the cabling mode of external power cables in IT scenarios of the FusionDC1000A?

A
Bottom cabling
B
End wall cabling
C
Top cabling
D
End door cabling

Premium Solution Locked

Unlock all 60 answers & explanations

QUESTION 12

What are the colors of indicators on the LCD panel of the MDU? (Choose all that apply.)

A
Yellow
B
Green
C
Red
D
Orange

Premium Solution Locked

Unlock all 60 answers & explanations

Full Question Bank Locked

You have reached the end of the free study guide preview. Upgrade now to unlock all 60 questions and the full simulation engine.

Customer Reviews

5 / 5
(15,000+ verified)
5
100%
4
0%
3
0%
2
0%
1
0%

Global Community Feedback

DM

David M.

Verified Student

"The practice engine is incredible. It feels exactly like the real testing environment and helped me build so much confidence."

SJ

Sarah J.

Premium Member

"The PDF is very well organized and the explanations for the answers are actually helpful, not just random text."

MC

Michael C.

Verified Buyer

"I was skeptical, but the content is high quality and definitely worth the price. I passed on my first try!"

Need Assistance?

> Our expert support team is available to assist you with any inquiries about our exam materials.

Contact Support
Average response: < 24 Hours

Get Exam Updates

> Subscribe to receive instant notifications on new questions and exclusive flash sales.

* Join 5,000+ students getting weekly updates

Support Chat โ— Active Now

๐Ÿ‘‹ Hi! How can we help you pass your exam?

Enter email to start chatting