PRINCE2 7 Practitioner Exam (PRINCE2-7-Practitioner)

Get full access to the updated question bank and confidently prepare for your exam.

Vendor

PRINCE2

Certification

PRINCE2 Project Management

Content

115 Qs

Status

Verified

Updated

23 hours ago

Test the Practice Engine

Experience our interactive testing environment with free demo questions

Launch Free Demo
Best Value Bundle

Premium Bundle

Complete Success Suite

$108 $69

Save $39 Instantly

  • Full PDF + Interactive Engine Everything you need to pass
  • All Advanced Question Types Drag & Drop, Hotspots, Case Studies
  • Priority 24/7 Expert Support Direct line to certification leads
  • 90 Days Free Priority Updates Stay current as exams change

Success Metric

98.4% Pass Rate

Verified by 15k+ Students
Secure Checkout
Popular

Standard Simulation

Practice Engine

$59

One-Time Payment

  • Web-Based (Zero Install)
  • Real Testing Environment Virtual & Practice Modes
  • Interactive Engine Drag & Drop, Hotspots
  • 60 Days Free Updates

Compatible with All Devices

Chrome
Verified Secure Checkout

Basic Tier

PDF Study Guide

$49

Digital Access

  • Exam Questions (PDF)
  • Mobile Friendly
  • 60 Days Updates
Download Free Sample PDF

Verified 23-Question Preview (PRINCE2-7-Practitioner)

Secure Checkout

Verified Community

The CertoMetrics Standard.

Recommend the #1 platform for verified PRINCE2 certification resources.

Success Network

Help a Colleague Succeed.

Invite a peer to get their own updated PRINCE2-7-Practitioner prep kit.

Exam Overview

The PRINCE2 7 Practitioner certification is a globally recognized benchmark for project management excellence, demonstrating your ability to apply the PRINCE2 methodology effectively in a real-world project environment. Achieving this certification signifies more than just theoretical knowledge; it validates your capability to tailor PRINCE2 principles, themes, and processes to manage diverse projects successfully. This credential is vital for professionals seeking to enhance project delivery, mitigate risks, and ensure projects align with business objectives. It opens doors to advanced career opportunities, increases your professional credibility, and equips you with the practical skills to drive project success and deliver tangible value within any organization.

Questions

68

Passing Score

38 out of 68 (55%)

Duration

150 Minutes

Difficulty

Expert

Level

Professional

Skills Measured

Applying PRINCE2 Principles to ensure projects are well-managed and deliver value.
Applying PRINCE2 Themes (Business Case, Organization, Quality, Plans, Risk, Change, Progress) to manage project aspects effectively.
Applying PRINCE2 Processes (Starting Up, Directing, Initiating, Controlling a Stage, Managing Product Delivery, Managing a Stage Boundary, Closing a Project) throughout the project lifecycle.
Tailoring PRINCE2 to suit various project environments, complexities, and organizational needs.
Creating, managing, and utilizing PRINCE2 Management Products (e.g., Project Brief, Project Initiation Documentation, Stage Plans) for effective project control.

Career Path

Target Roles

Project Manager Programme Manager Project Team Lead

Common Questions

Is the material up to date?

Yes. We update our question bank weekly to match the latest PRINCE2 standards. You get free updates for 90 days.

What format do I get?

You get instant access to both the **PDF** (for reading) and our **Premium Test Engine** (for exam simulation).

Is there a guarantee?

Absolutely. If you fail the PRINCE2-7-Practitioner exam using our materials, we offer a full money-back guarantee.

When do I get the download?

Instantly. The download link is available in your dashboard immediately after payment is confirmed.

Free Study Guide Samples

Previewing updated PRINCE2-7-Practitioner bank (23 Questions).

QUESTION 1

The project manager is preparing the communication management approach. The project manager has asked the Heritage Director to speak at the next Louistown Heritage Society meeting about how the town's historic buildings will be protected during the shopping centre build- He has been asked to 'own' communication with the Heritage Society.

Under which heading of the communication management approach should this information be recorded?

A
Stakeholder analysis
B
Communications schedule and procedure(s)
C
Resources
D
Responsibilities

Correct Option: D

The Communication Management Approach details how and when project information will be communicated to stakeholders. The section dedicated to 'Responsibilities' is where the allocation of specific communication tasks and ownership to individuals or roles is recorded. Asking the Heritage Director to 'own' communication with the Heritage Society is a clear assignment of a communication responsibility. Therefore, this information should be documented under the 'Responsibilities' heading. While the Heritage Society is a stakeholder (A), and the communication event might be in the schedule (B), and resources might be needed (C), the specific assignment of who is accountable for that communication falls squarely under responsibilities.



Reference: AXELOS PRINCE2 7th Edition, The PRINCE2 Processes - Managing Communications, and specifically the Communication Management Approach content.
QUESTION 2

ORGANIZATION

Here are three roles relating to the LouisShopping Project.

Which individual (A-F) would be most appropriate for each role according to the 'organization' practice?

Choose only ONE individual for each role- Each individual can be used once, or not at all.

Technical Scenario Diagram
Answer Canvas

Project Board Role Assignments

Based on the PRINCE2 organization practice, the project board roles are assigned to individuals with the appropriate authority and representation for business, user, and supplier interests.

  • Business Opportunities Director (F) matches with -> Project executive
    Reasoning: The project executive is accountable for the project's success and owns the business case. The Business Opportunities Director's role focuses on improving business opportunities, the project's primary benefit. Her senior experience and direct interest make her the ideal candidate to champion the project and ensure value is delivered.
  • Heritage Director (E) matches with -> Senior user
    Reasoning: The senior user represents those who will use or be affected by the project's product. A critical success factor is preserving the town's historical nature. The Heritage Director is the most appropriate person to represent this crucial user interest and specify the related requirements.
  • CEO of BuildyBrick (D) matches with -> Senior supplier
    Reasoning: The senior supplier represents the interests of those who will build the project's product. BuildyBrick is the main contractor for construction. The CEO has the authority to commit the necessary resources and is accountable for the quality and feasibility of the main supplier's work.



Reference: https://www.axelos.com/certifications/prince2/prince2-7-practitioner-certification

QUESTION 3

PLANS

Here are three actions undertaken when planning stage 3.

During which activity of the 'planning' technique (A-F) should the actions occur?

Choose only ONE activity for each action. Each activity can be used once, more than once, or not at all.

Technical Scenario Diagram
Answer Canvas

PRINCE2 Planning Technique - Activity Mapping

This question assesses understanding of the specific activities within the PRINCE2 planning technique and how practical planning actions map to them.

Mapping Details:

Action: 'Identifying the dependencies between the building shell, the roof and the utilities' matches with -> C. Preparing a schedule
Reasoning: Creating a schedule involves sequencing activities. A core part of this is identifying dependencies, which define the logical order in which tasks must be performed. For example, the building shell must be completed before the roof can be installed.

Action: 'Adding an extra activity to the plan to lay a protection mesh...' matches with -> F. Analysing risks
Reasoning: The action described is a risk response. The potential for storms is a threat (a risk), and adding the activity to lay a protection mesh is a mitigation action to reduce the impact of that threat. This action directly results from the 'Analysing risks' step of planning.

Action: 'Prioritizing the acceptance criteria and quality specifications of the heating system...' matches with -> A. Defining and analysing products
Reasoning: This action focuses on the characteristics of a deliverable (the heating system). Acceptance criteria and quality specifications are defined within Product Descriptions, which are created during the 'Defining and analysing products' activity. This step ensures clarity on *what* is to be built and to what standard.



Reference: https://www.axelos.com/certifications/prince2/prince2-7-practitioner-certification

QUESTION 4

Scenario2: Louistown City Council

During excavation for the underground parking space, a water pipe was damaged. The City Council repaired the pipe, however some rework of the parking space will be required. This rework will take an extra 3 days, but will have no impact on the stage plan nor on other work packages within the stage. The plan needs to be updated to include the rework, which will still finish within the timescales.

According to the 'plans' practice, Mich rode should update this plan?

A
Project executive
B
Senior user
C
Project manager
D
Team manager

Correct Option: C

The Project Manager is responsible for the day-to-day management of the project, including creating, maintaining, and updating the Stage Plans. When an issue like the damaged water pipe occurs, even if the rework falls within existing tolerances and doesn't impact other work packages, the Project Manager is responsible for ensuring the relevant plan (e.g., the Stage Plan or a detailed plan for the work package) is updated to reflect the change. They manage the overall progress and ensure the plan remains accurate and viable. The Team Manager executes work packages but the Project Manager maintains the overarching stage plan.

Reference: https://www.axelos.com/prince2-7

QUESTION 5

Scenario2: Louistown City Council

The project is at the end of the initiation stage and the project manager is finalizing the high-level project plan. The stage 2 plan is also being produced, and the architect has been asked to produce the team plan for the design to support production of the stage plan. The project manager will submit the high-level project plan and the architect's team plan to the project board for approval at the end of stage 1.

Is this an appropriate application of the 'plans' practice, and why?

A
Yes, because the high-level project plan should provide the project board with the confidence that the project will fulfil its business case
B
Yes, because high-level project plan should identity the work packages into which the architects delivery activities will be organized
C
No, because the stage plan should be submitted to the project board for approval, along with the architects team plan
D
No, because the high-level project plan should be submitted to the project board with the stage 2 plan to provide confidence that the project will fulfil its business case

Correct Option: D

The scenario is an inappropriate application of the 'plans' practice. At the end of the initiation stage (Managing a Stage Boundary process), the Project Board requires the Project Plan (high-level) and the next Stage Plan (Stage 2 plan in this case) for approval. The purpose of this submission is to confirm the project's viability and provide confidence that the project will fulfill its business case. The scenario incorrectly states that the Project Manager will submit the 'architect's team plan' to the Project Board. Team Plans are derived from Stage Plans and are used by Team Managers to manage their work packages; they are not typically submitted to the Project Board for approval. Therefore, the Project Manager's proposed action is incorrect because the Stage 2 plan is missing from the submission, and the team plan is inappropriately included. Options A and B are incorrect because, while the high-level project plan is important, the scenario's overall submission is flawed. Option B also incorrectly states that the high-level project plan identifies work packages; it identifies stages. Option C is incorrect because it suggests the architect's team plan should be submitted to the Project Board, which is not standard PRINCE2 practice.

Reference: https://www.axelos.com/prince2/prince2-7

QUESTION 6

Scenario2: Louistown City Council

The following entry has been recorded as a quality specification in the product description for the shopping centre retail space:

"The shopping centre will provide leisure and restroom space of a minimum of 2000 m2-"

Is an appropriate application of the 'quality' practice, and why?

A
Yes, because the portfolio office should check that the quality control techniques are sufficient for the retail space to meet quality specifications
B
Yes, because a quality specification should enable realistic planning, estimating, and scheduling of the retail space, as well as its quality control
C
No, because the retail space in the shopping centre is a key output from the project, rather than a quality specification
D
No, because this information should be recorded as a quality method in the quality register to be applied when checking the retail space

Correct Option: B

Option B (Correct)
Reasoning: In PRINCE2, product descriptions explicitly include quality criteria (specifications) that define the required quality of a product. These criteria must be objective and measurable, like "minimum of 2000 m2". Such detailed specifications are crucial because they enable realistic planning (scope of work), estimating (resources required), scheduling (timeframes), and subsequent quality control (verification that the product meets the defined standard). Therefore, recording this as a quality specification is an appropriate application of the 'quality' practice, as it directly supports these project management functions.

Why the other choices are incorrect:
* Option A is incorrect: While quality control is vital, the portfolio office operates at a strategic level, focusing on overall portfolio performance and strategic alignment, not the detailed quality control techniques of individual project outputs. This responsibility primarily lies with the project management team and specialists.
* Option C is incorrect: The retail space is indeed a key output, but the statement provided is a quality specification for a component (leisure and restroom space) of that output. Product descriptions are designed to capture these precise quality requirements for project outputs.
* Option D is incorrect: The information provided is a quality criterion or specification, which is part of a product description. A quality method describes how quality will be achieved or checked (e.g., inspection, expert review), and while the quality register tracks planned quality activities, it doesn't house the detailed product-specific quality criteria.



Reference: PRINCE2 7th Edition, Chapter 8.3 Quality Practice, and Chapter 7.2.2 Product Description.
QUESTION 7

Scenario2: Louistown City Council

The following risk has been recorded in the risk register:

Risk description:

"Because of the large project budget involved, many potential suppliers are likely to provide quotations, which may result in more innovative solutions at very competitive prices.-

The procurement team manager has selected the following risk response and will also be responsible for preparing the advertisements for the request for proposal:

"The request for proposal will be published widely in trade publications with an extended deadline and ask for innovative, competitive quotations."

Is an appropriate application of the 'risk' practice, and why?

A
Yes, because the procurement team manager should be responsible for responding to the risk and publishing the advertisements
B
Yes, because the procurement team manager should be responsible for a risk budget to manage this risk within the project budget
C
No, because the procurement team manager is likely to be influenced negatively by decision bias when making decisions about risks
D
No, because the procurement team manager should not be both the risk owner and risk action owner for the same risk

Correct Option: D

Option D (Correct)

This scenario highlights a key principle in PRINCE2 risk management regarding roles and responsibilities. PRINCE2 distinguishes between the Risk Owner, who is accountable for a specific risk and ensuring its effective management (including selecting appropriate responses), and the Risk Action Owner, who is responsible for carrying out a specific action to implement a chosen risk response. Best practice advises against assigning both roles for the same risk to the same individual. Combining these roles, as the procurement team manager is doing by both selecting the response and executing an action (preparing advertisements), creates a lack of independent oversight and accountability, making it an inappropriate application of the 'risk' practice.

Why the other choices are incorrect:

  • Option A is incorrect: While a manager might execute an action, PRINCE2 advises against them being both the risk owner and action owner for the same risk due to oversight and accountability.
  • Option B is incorrect: The question focuses on the appropriateness of role assignment in risk management, not on the manager's responsibility for a risk budget. This option introduces an irrelevant point.
  • Option C is incorrect: While decision bias is a relevant risk management consideration, the primary PRINCE2 reason for not combining these roles is the more fundamental principle of separation of duties to ensure independent oversight and clear accountability, rather than solely preventing bias. Option D provides a more direct and stronger PRINCE2-specific reason.


Reference: https://www.axelos.com/prince2-7-edition-guidance
QUESTION 8

Scenario2: Louistown City Council

The following entry has been recorded in the risk register as a 'construction' risk:

Risk description: "Because the parking space Is underground and requires excavation, there is a risk that this work could damage the surrounding buildings of

historical significance, leading to the failure to protect these historic buildings as required by the City Council. Is an appropriate entry for the risk register, and why?

A
Yes, because the source of the risk, the area of uncertainty and the impact on objectives are specified
B
Yes, because the risk should be identified using risk categories to help with prioritizing the risk
C
No, because protecting the surrounding buildings is not one of the project's objectives
D
No, because this risk does not affect the LouisShopping centre build and the impact on project timescales would be very Iow

Correct Option: A

Option A (Correct)
Reasoning: The provided risk description is appropriate because it clearly follows the PRINCE2 recommended format for describing a risk: Cause, Event, and Effect (CEE). The 'Cause' is identified as "Because the parking space Is underground and requires excavation." The 'Event' (the uncertain event) is "there is a risk that this work could damage the surrounding buildings of historical significance." The 'Effect' (the impact on project objectives) is "leading to the failure to protect these historic buildings as required by the City Council." This comprehensive structure ensures clarity and aids in risk management.

Why the other choices are incorrect:
* Option B is incorrect: While risk categories are used in PRINCE2 to aid prioritization, the question asks why the specific entry (the description itself) is appropriate. The CEE format is the primary reason for its appropriateness.
* Option C is incorrect: Protecting surrounding buildings, especially when



Reference: PRINCE2 7 Managing Successful Projects, Section 10.2.1 Risk description and Risk register
QUESTION 9

PROGRESS

Here are three actions related to 'progress' practice for the LouisShopping project-

Which role (A-E) should be responsible for each action?

Choose only ONE role for each action. Each role can be used once, more than once, or not at all-

Technical Scenario Diagram
Answer Canvas

Rationale for Correct Mappings:

Based on the PRINCE2 methodology, the responsibilities are assigned as follows:

Action 1: 'Decide that testing and inspections should focus on the 'must-have' and 'should-have' tests and inspections in order to guarantee on-time delivery of the stage' matches Role C: Project manager.

This is a day-to-day management decision aimed at keeping the stage within its time tolerance. The Project Manager is responsible for managing progress at the stage level and taking corrective action to prevent a forecast deviation from tolerances. Prioritizing work is a key part of this responsibility.

Action 2: 'Authorize the team delivering the roof of the shopping centre to start work' matches Role C: Project manager.

The Project Manager authorizes the start of work packages. The 'team delivering the roof' would be assigned a work package, and it is the Project Manager's duty to issue this authorization, ensuring the team understands what needs to be delivered, by when, and within what constraints.

Action 3: 'Store a report escalating a breach of stage 3 time tolerance on the shared drive to enable easy access by the project board' matches Role E: Project support.

This is an administrative and configuration management task. While the Project Manager creates the exception report, the responsibility for maintaining project files, providing access to documentation, and managing communications tools falls under Project Support. This role assists the Project Manager with these administrative duties.



Reference: https://www.axelos.com/certifications/prince2/prince2-7-practitioner-certification, particularly the sections on the 'Progress' practice and role descriptions in Appendix C of the 'Managing Successful Projects with PRINCE2 7th Edition' manual.

QUESTION 10

Scenario2: Louistown City Council

The procurement team has requested quotations from several IT suppliers for the IT systems- There have been more queries from potential suppliers than expected, delaying the team's analysis of the quotations beyond the work package time tolerance- The team manager raised an issue to the project manager. In response, the project manager has some scope tolerance for the stage and has requested the team manager to replan to see whether the team can deliver within tolerance by reducing the number of quotations reviewed.

Is an appropriate application of the 'progress' practice, and why?

A
Yes, because the project manager should use event-driven controls when an exception occurs to enable the work to be replanned
B
Yes, because the project manager should advise what corrective actions are required to resolve the issue within stage tolerances
C
No, because the project manager should produce an exception plan when a work package is forecast to exceed its tolerances
D
No, because the project manager should report the issue in the next highlight report for the project board to make a decision

Correct Option: B

Option B (Correct)
The 'progress' practice in PRINCE2 emphasizes managing by exception. The Project Manager (PM) is responsible for managing daily within the delegated stage tolerances. When a work package exceeds its tolerance, it becomes an issue for the PM to manage. In this scenario, the PM still has stage tolerance and is appropriately advising the Team Manager to take corrective action (replan by reducing reviewed quotations) to ensure the stage remains within its approved tolerances. This proactive management prevents the stage itself from going out of tolerance.

Why the other choices are incorrect:

  • Option A is incorrect: While the PM initiates replanning, an 'exception' in PRINCE2 context typically refers to when a stage or project tolerance is forecast to be exceeded, leading to an Exception Report to the Project Board. Here, the PM is resolving within stage tolerance, so it's not yet an exception at the stage level.
  • Option C is incorrect: An exception plan is produced for the stage or project when its tolerances are forecast to be exceeded, not for a work package that has exceeded its tolerance, especially when the Project Manager still has overall stage tolerance to work with.
  • Option D is incorrect: The Project Manager has the authority to resolve issues and take corrective action within stage tolerances without immediately escalating to the Project Board for a decision. Reporting in a highlight report is for routine progress, and only if the stage tolerance were forecast to be exceeded would an Exception Report be appropriate for the Project Board to make a decision.



Reference: PRINCE2 7 Managing Successful Projects, Section 5.3 (Progress practice), Section 4.5 (Management by Exception principle), Section 12 (Managing Issues)
QUESTION 11

Scenario2: Louistown City Council

PROCESSES

The project is in the 'starting up a project' process. BuildyBrick has been appointed as the main contractor to do the construction work and it has been decided that BuildyBrick will be represented on the project board.

Which practice is being applied in the ‘starting up a project' process when making this decision?

A
Issues
B
Organization
C
Business case
D
Quality

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 12

Scenario2: Louistown City Council

The project is in the 'starting up a project' process. The Business Opportunities Director has consulted with the CEO of BuildyBrick and decided that the project should be delivered using a linear delivery approach.

Which practice is being applied when making this decision?

A
Quality
B
Plans
C
Business case
D
Progress

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 13

Scenario2: Louistown City Council

The Council has never done this type of complex infrastructure project before. As a result, the project manager organized a workshop during the 'starting up a project' process to discuss the best approach for developing the new shopping centre. Participants included people from the Council's internal departments, potential suppliers and also people from other councils who had completed similar modernization projects.

Is this an appropriate application of the 'starting up a project' process, and why?

A
Yes, because a workshop including external people is a useful way to assess previous lessons
B
Yes, because a workshop is a useful way to assess the skills of the potential suppliers
C
No, because the 'starting up a project' process should be an internal process involving Council staff
D
No, because detailed planning should be carried out during the 'initiating a project' process

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 14

Scenario2: Louistown City Council

The project is at the end of stage 3 and the stage 4 plan has been produced and submitted to the project board for approval in the 'directing a project' process.

The project management team has been authorized to release funds for stages 4 and 5, without the need for further approval from the City Council or the Portfolio Board.

Which role should be responsible for approving the plans for stages 4 and 5?

A
Project executive
B
Business layer
C
Senior user
D
Senior supplier

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 15

Scenario2: Louistown City Council

As part of the 'directing a project' process, the project board has reviewed the project initiation documentation (PID) and the full business case in order to 'authorize the project and confirm that the design work in stage 2 can start.

Is an appropriate application of the 'directing the project' process, and why?

A
Yes, because the decision to authorize the design work should be taken by the project board when authorizing the PID
B
Yes, because the approval by the project board should replace the need to notify the business areas of project authorization
C
No, because the project board should approve both the stage 2 plan and the PID in order for the design work to start
D
No, because the project manager should request the City Council to 'authorize the project at the end of the initiation stage

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 16

Scenario2: Louistown City Council

The project is in the 'initiating a project' process- The LouisShopping Project is part of the 'Louistown Open for Business' (LOB) portfolio. The LouisShopping Project needs to comply with the portfolio's information strategy. As a result, the project manager has recommended that the project's digital and data management approach should be based on the portfolio's Information strategy, with a few adaptations to suit the project's needs.

In which activity of the a project' process should this recommendation be approved?

A
Request project authorization
B
Agree the management approaches
C
Establish project controls
D
Prepare the project plan

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 17

Scenario2: Louistown City Council

The project is in the 'initiating a project' process. The project manager is not an expert on the Council's sustainability targets and needs some help with defining how these targets will be achieved and measured. Therefore, the project manager has asked the Sustainability Officer to draft the sustainability management approach.

Is this an appropriate application of the 'agree the management approaches' activity, and why?

A
Yes, because the Sustainability Officer should draft the approach, with the project manager remaining responsible
B
Yes, because the Sustainability Officer should be responsible for collecting data to ensure the project meets the Council's sustainability targets
C
No, because the project manager should develop the sustainability management approach to meet the Council's sustainability targets
D
No, because the Sustainability Officer should review the approach as a project assurance activity on behalf of the project board

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 18

Scenario2: Louistown City Council

The project is in the 'controlling a stage' process in stage 3. The team manager has notified the project manager that the site preparation work package Is complete. However, the specified site inspections have not been recorded as a ‘pass' in the quality register. Following discussion with the team manager, it appears that these inspections have taken place, and the products have been approved- The quality register and stage plan now need to be updated.

Which role should be consulted when updating the quality register and stage plan?

A
BuildyBrick's project assurance
B
Site preparation team manager
C
Project assurance
D
Senior user

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 19

Scenario2: Louistown City Council

During stage 3, electric charging points are being installed in the car parks. As part of the 'controlling a stage' process, the project manager fi'Et at the 'LouisShopping' car park wiffl the specialist supplier delivering this work package. They reviewed the charging points installed so far, discussed the logistical problems experienced and agreed the remaining actions to be taken.

Which statement explains why this is an appropriate way to implement the 'evaluate work package status' activity?

A
Because the project manager should collect status information about the charging points to include in the checkpoint report
B
Because the project manager should approve the products in each work package, including the installation of the electric charging points
C
Because the project manager should informally talk to the team manager to understand their issues and risks, and to maintain the relationship
D
Because the project manager should co-create work package for the charging points with the team manager as the work progresses

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 20

Scenario2: Louistown City Council

The project is in the 'managing product delivery' process in stage 3 and the site preparation is well underway. The site preparation team manager has arranged several site inspections by the Council Inspector, as required in the work package and site preparation product descriptions. The Council Inspector has approved the work completed so far but further inspections are scheduled over the coming weeks. The team manager needs to communicate the progress made to-date.

Which role should review the progress made by the team?

A
Business layer
B
Project manager
C
Project executive
D
Project assurance

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 21

Scenario2: Louistown City Council

The project is in the 'managing product delivery' process at the beginning of stage 2. The 'design' for shopping centre is being delivered by BuildyBrickis architect.

The architect is discussing and agreeing with the project manager the design, safety aspects that need to be complied with during site visits and how frequently the architect should advise the project manager about progress.

During which activity of the 'managing product delivery process should the architect carry out these discussions?

A
Notify work package completion
B
Execute a work package
C
Evaluate a work package
D
Accept a work package

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 22

Scenario2: Louistown City Council

The project is nearing the end of stage 4. The project manager has reported that the testing of the ventilation system is going to take longer than planned, and the stage is likely to exceed time tolerance. As a result, the project board has requested that the project manager should replan the stage. They have also requested confirmation from the project manager that the rest of the project can be completed in line with the project plan and business case before approving the updated plan.

Which practice is being applied by the 'managing a stage boundary' process when providing this confirmation to the project board about the rest of the project?

A
Plans
B
Progress
C
Issues
D
Quality

Premium Solution Locked

Unlock all 115 answers & explanations

QUESTION 23

Scenario2: Louistown City Council

The project is in stage 4 and there has been a significant delay in the testing of the shopping centre ventilation system. As a result, the time and cost tolerances for the stage are forecast to be exceeded. The project manager has reported the situation to the project board and they have requested that the project manager replan the stage, allowing extra time and cost. The project is producing the updated plan to resolve this situation.

Which role should approve this updated plan?

A
Business layer
B
Project executive
C
Project assurance
D
Project manager

Premium Solution Locked

Unlock all 115 answers & explanations

Full Question Bank Locked

You have reached the end of the free study guide preview. Upgrade now to unlock all 115 questions and the full simulation engine.

Customer Reviews

5 / 5
(15,000+ verified)
5
100%
4
0%
3
0%
2
0%
1
0%

Global Community Feedback

DM

David M.

Verified Student

"The practice engine is incredible. It feels exactly like the real testing environment and helped me build so much confidence."

SJ

Sarah J.

Premium Member

"The PDF is very well organized and the explanations for the answers are actually helpful, not just random text."

MC

Michael C.

Verified Buyer

"I was skeptical, but the content is high quality and definitely worth the price. I passed on my first try!"

Need Assistance?

> Our expert support team is available to assist you with any inquiries about our exam materials.

Contact Support
Average response: < 24 Hours

Get Exam Updates

> Subscribe to receive instant notifications on new questions and exclusive flash sales.

* Join 5,000+ students getting weekly updates

Support Chat ● Active Now

👋 Hi! How can we help you pass your exam?

Enter email to start chatting